Feasibility studies, ESIA, Detailed Preliminary Design and CAD, of the Tirso – Flumendosa – Campidano and Sulcis Inglesiente integrated hydraulic and energy system.
The project provides an integrated hydraulic and energy system for the development of solar energy and water resources. To meet the energy needs, a 2.5 MW solar plant was planned.
The development plan will also be able to interconnect the Tirso – Flumendosa – Campidano and Sulcis Inglesiente hydraulic systems, to ensure the supply of drinking water and irrigation to a large sub-region in the South of the Sardegna Region in Italy.
-
Operational Headquarters Italy Via Guido Rossa 29 – Padova
-
Mobile: 349 344 525 0
EN