Water Supply & Sanitation |
|
Africa |
BOTSWANA |
FEASIBILITY STUDY FOR THE ZAMBEZI INTEGRATED AGRO-COMMERCIAL DEVELOPMENT PROJECT. |  |
|
|
MAURITIUS |
MAURITIUS WASTEWATER MASTER PLAN STUDY |  |
|
|
TECHNICAL DUE DILIGENCE OF WATER AND SANITATION SERVICES OF THE ISLAND OF MAURITIUS |  |
|
|
MOZAMBIQUE |
WATER SERVICES AND INSTITUTIONAL SUPPORT PROJECT DESIGN CHECK AND SUPERVISION OF NETWORK EXPANSION FOR NAMPULA, ANGOCHE AND PEMBA |  |
|
|
NIGER |
UPGRADING AND EXTENSION OF THE DRINKING WATER SUPPLY SYSTEM IN THE TOWN OF ARLIT |  |
|
|
UPGRADING AND EXTENSION OF THE DRINKING WATER SUPPLY SYSTEM IN THE TOWN OF AGADEZ |  |
|
|
PROGRAM FOR THE INTEGRATION OF 19 NEW COMMUNITIES WITHIN THE DEVELOPMENT PLANS OF SEVERAL REGIONS IN NIGER |  |
|
|
SENEGAL |
TECHNICAL ASSISTANCE FOR THE MANAGEMENT, CONTROL AND SUPERVISION OF WORKS FOR THE TURNKEY PROJECT FOR CONSTRUCTION OF THE BOOSTER PUMP OF CARMEL |  |
|
|
TECHNICAL AND ENVIRONMENTAL STUDY FOR THE CONSTRUCTION OF WWTP AND PUMPING STATION IN THE RESETTLEMENT AREA OF KEUR MASSARTIVAOUANE PEULH |  |
|
|
“PROGRAMME EAU POTABLE ET ASSAINISSEMENT DU MILLÉNAIRE – PEPAM” PRELIMINARY DESIGN / DESIGN AND SUPERVISION OF WORKS LOT N. 4 – EASTERN AND SOUTHERN ZONES |  |
|
|
PROJECT FOR DRINKING WATER PROVISION TO THE CITIES OF KAOLACK, FATICK, KOUNGHEUL AND ZIGUINCHOR GIS AND MATHEMATICAL MODEL OF THE WATER NETWORKS |  |
|
|
UPDATING OF THE SANITATION MASTER PLAN OF JOAL FADIOUTH DISTRICT |  |
|
|
SUPERVISION OF WORKS ON THE DRINKING WATER SUPPLY SYSTEM FOR BLAISE DIAGNE INTERNATIONAL AIRPORT AND FOR THE SPECIAL INTEGRATED ECONOMIC AREA OF DIASS |  |
|
|
DETAILED DESIGN, AND ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT OF 4 WATER TREATMENT PLANTS IN FATICK, KAOLACK AND KOUNGHEUL |  |
|
|
DESIGN OF 4 WATER TREATMENT PLANTS IN FATICK, KAOLACK AND KOUNGHEUL |  |
|
|
SEYCHELLES |
WATER TREATMENT PLANTS AND MEASUREMENT WEIRS REHABILITATION - PROJECT NEPTUNE |  |
|
|
SIERRA LEONE |
“WATER SUPPLY AND SANITATION STUDY” DRILLING OF EXPLORATORY BOREHOLES – EXECUTION OF PUMPING AND WATER QUALITY TESTS DETAILED DESIGN OF THREE WATER TREATMENT PLANTS IN SIERRA LEONE |  |
|
|
UGANDA |
WATER MANAGEMENT AND DEVELOPMENT PROJECT: RUKUNGIRI, KATWE-KABATORO AND KOBOKO |  |
|
|
America - South |
BOLIVIA |
IMPROVEMENT PROGRAM OF BASIC SERVICE INFRASTRUCTURE FOR THE TOURISM CIRCUIT OF SALAR DE UYUNI AND COLORED LAGOONS |  |
|
|
Asia |
CHINA |
TAICANG PILOT PROJECT |  |
|
|
INDONESIA |
PRE-FEASIBILITY STUDY FOR THE DEVELOPMENT OF CIMAHI WATER SUPPLY PROJECT |  |
|
|
KRABYAKAN SPRING WATER SUPPLY PROJECT |  |
|
|
KAZAKHSTAN |
BOLASHAK TREATED WASTEWATER REUSE APPLICATIONS EVALUATION STUDY |  |
|
|
Europe |
ALBANIA |
TIRANA CREDITWORTHINESS ENHANCEMENT PROGRAMME (CEP) |  |
|
|
BULGARIA |
DUE DILIGENCE OF WATER AND SANITATION SERVICES OF DOBRICH UTILITY |  |
|
|
CERNI OSSAM FEASIBILITY STUDY FOR THE INTEGRATED WATER RESOURCES MANAGEMENT |  |
|
|
CROATIA |
FINANCIAL AND OPERATIONAL PERFORMANCE IMPROVEMENT PLAN VODOVOD I KANALIZACIJA D.O.O., KARLOVAC |  |
|
|
ITALY |
UPGRADING OF THE WASTEWATER TREATMENT PLANT OF PADUA (240,000 PE) |  |
|
|
MASTER PLANS FOR WATER AND WASTEWATER SERVICES IN ITALIAN WATER DISTRICTS |  |
|
|
UPGRADE AND IMPROVEMENT OF THE WASTEWATER TREATMENT PLANT IN THE MUNICIPALITY OF GRADISCA |  |
|
|
IMPROVEMENT OF THE HYDRAULIC PERFORMANCE AND UPGRADE OF PESCHIERA DEL GARDA TREATMENT PLANT (330,000 PE) |  |
|
|
DETAILED DESIGN FOR THE UPGRADING OF THE CENTRALISED PLANT OF CONSELVE (PADUA, ITALY) INCLUDING THE REHABILITATION OF THE EXISTING STRUCTURES |  |
|
|
UPGRADING OF THE WASTE WATER TREATMENT PLANT OF TEZZE SUL BRENTA |  |
|
|
DETAILED DESIGN AND SAFETY COORDINATION OF WORKS FOR THE CONSTRUCTION OF THE 2ND LINE OF THE PERO (MILAN) WWTP - 1ST LOT |  |
|
|
EXTENSION, REHABILITATION AND UPGRADING OF WASTEWATER TREATMENT PLANT OF MONZA S. ROCCO – MASTER PLAN AND PRELIMINARY DESIGN |  |
|
|
CONNECTION OF THE SEWER LINE OF THE MUNICIPALITY OF FINALE LIGURE TO THE WATER TREATMENT PLANT OF SAVONA |  |
|
|
RECONSTRUCTION OF THE WATER SUPPLY SYSTEM OF WESTERN MONTESCURO |  |
|
|
EXTENSION AND UPGRADING OF THE WATER SUPPLY INFRASTRUCTURE IN THE MUNICIPALITIES OF VAL DI SUSA (PROVINCE OF TURIN) |  |
|
|
WATER SUPPLY CONNECTION MONSELICE - ESTE (PROVINCE OF PADUA) |  |
|
|
REHABILITATION AND UPGRADING OF FAVARA DI BURGIO WATER SUPPLY SYSTEM |  |
|
|
REMEDIATION OF SOCIO-ECONOMICAL-ENVIRONMENTAL EMERGENCY IN THE SARNO RIVER BASIN |  |
|
|
CONCESSION FOR BUILDING AND MANAGEMENT OF MILAN WASTEWATER TREATMENT PLANT |  |
|
|
DESIGN OF LOWER FRIULI SEWAGE NETWORK AND WASTEWATER TREATMENT PLANT |  |
|
|
DESIGN OF THE DESALINATION PLANT OF PRESIDIANA TERMINI IMERESE |  |
|
|
DETAILED DESIGN OF ANGRI WASTEWATER TREATMENT PLANT (SALERNO) |  |
|
|
WASTEWATER TREATMENT PLANT OF FUSINA (MESTRE - VENICE) CONSTRUCTION OF THE 4TH TREATMENT LINE |  |
|
|
PRELIMINARY MASTER PLAN FOR SEWER SYSTEMS IN VENICE PERIPHERAL AND ISLAND AREAS |  |
|
|
UPGRADING OF THE WASTEWATER TREATMENT PLANT OF VENICE - CAMPALTO |  |
|
|
REFURBISHMENT OF THE EXISTING INFRASTRUCTURE AND UPGRADING OF THE OPERATIONAL EFFICIENCY OF THE WASTEWATER TREATMENT PLANT OF PADUA CA’ NORDIO |  |
|
|
UPGRADING OF THE WASTEWATER TREATMENT PLANT OF PADUA CA’ NORDIO TO COMPLY WITH THE EU STANDARDS |  |
|
|
SERBIA |
PANČEVO ACTION PROGRAM EXTENSION AND UPGRADING OF THE SANITATION FACILITIES, PHASES I-II-III |  |
|
|
MENA - Middle East and North Africa |
EGYPT |
TECHNICAL ASSISTANCE TO THE BOARD OF DIRECTORS AND MANAGEMENT OF THE HCWW IN THE PREPARATION OF THE NATIONAL STRATEGY FOR WATER SUPPLY AND SANITATION |  |
|
|
WATER SECTOR REFORM PROGRAM PHASE II |  |
|
|
INNOVATIVE MEANS OF INCREASING WATER RESOURCES IN NORTH SINAI |  |
|
|
IRAQ |
INTEGRATED WATER AND SANITATION MASTER PLAN & CAPACITY BUILDING FOR THI QAR GOVERNORATE |  |
|
|
STUDY AND DESIGN OF SEWAGE PROJECT FOR AL-GAMMAS SUB-DISTRICT TOWN IN QADISIYAH GOVERNORATE |  |
|
|
TECHNICAL ASSISTANCE FOR THE CONSTRUCTION OF THE NEW WATER SUPPLY SYSTEM FROM LESSER ZAB RIVER TO THE TOWN OF SULAYMANIYAH |  |
|
|
INTEGRATED WATER AND SANITATION MASTER PLAN & CAPACITY BUILDING FOR SULEIMANIYAH GOVERNORATE |  |
|
|
CONSTRUCTION SUPERVISION OF COMPLETION OF THE URBAN REHABILITATION AND UPGRADING OF THE WATER SUPPLY SYSTEM OF BADAWA QUARTER ERBIL GOVERNORATE, KURDISTAN REGION |  |
|
|
FUNCTIONAL REVIEW, SERVICE DELIVERY ASSESSMENT AND STRATEGIC ROADMAP FOR MODERNIZATION OF WATER AND SANITATION SECTOR |  |
|
|
CONSULTANCY FOR SUPERVISION OF ENGINEERING OF 12,000 M 3/H DOKANSULEIMANIYAH WATER SUPPLY SCHEME IN NORTHERN IRAQ |  |
|
|
DESIGN & CONSTRUCTION OF RURAL WATER SUPPLY AND SANITATION SYSTEM SUPPORT FOR ENVIRONMENTAL MANAGEMENT OF THE IRAQI MARSHLANDS |  |
|
|
CONSULTANCY SERVICE FOR OPTIMIZING THE PERFORMANCE OF SARCHINAR WATER PROJECT IN SULAYMANIYAH |  |
|
|
DESIGNING OF DOKAN SEWERAGE |  |
|
|
PREPARATION OF STUDY, TECHNICAL SPECIFICATIONS, DESIGNS AND BILL OF QUANTITIES FOR AL HAY AND AL BASHAER WATER PROJECT IN WASIT GOVERNORATE |  |
|
|
WATER AND SANITATION MASTER PLAN FOR SOUTHERN IRAQ |  |
|
|
SEWERAGE AND WASTEWATER TREATMENT PLANT FOR THE CITY OF AL DIWANIYAH |  |
|
|
TECHNICAL ASSISTANCE FOR THE CONSTRUCTION OF THE NEW WATER SUPPLY |  |
|
|
STUDY AND DESIGN OF SEWAGE PROJECT FOR AL-SEINIYAH SUB-DISTRICT TOWN IN SALAH AL DIN GOVERNORATE |  |
|
|
TRAINING COURSE FOR DESIGN AND MODELLING OF WATER NETWORKS AND WTPS FOR VILLAGES AND SMALL TOWNS |  |
|
|
JORDAN |
GREATER AMMAN WATER AND WASTEWATER SYSTEMS REHABILITATION DETAILED DESIGN OF THE DAHEYAT EL RASHEED AND KARABSHE (R3 ZONE) |  |
|
|
PALESTINE |
SEA WATER DESALINATION PLANT PROJECT FOR SOUTHERN GOVERNORATES OF GAZA STRIP |  |
|
|
YEMEN |
FEASIBILITY AND MARKET STUDY ON COMPACT UNITS FOR WASTE WATER TREATMENT |  |
|
|