Water Resources Management |
|
Africa |
ETHIOPIA |
CONSTRUCTION SUPERVISION & CONTRACT MANAGEMENT WORKS FOR KURAZ DIVERSION WEIR PROJECT |  |
|
|
CONSTRUCTION SUPERVISION & CONTRACT MANAGEMENT WORKS FOR ZAREMA MAY-DAY DAM PROJECT |  |
|
|
MAURITIUS |
DEVELOPMENT OF AN INUNDATION, FLOODING AND LANDSLIDE NATIONAL RISK PROFILE, MAPS, STRATEGY FRAMEWORK AND ACTION PLANS FOR DISASTER RISK MANAGEMENT FOR THE REPUBLIC OF MAURITIUS |  |
|
|
NIGER |
MASTER PLAN FOR DRINKING WATER SUPPLY TO INSULAR AND NIGER RIVERSIDE VILLAGES |  |
|
|
NIGERIA |
HYDROLOGICAL STUDY AND RISK ASSESSMENT ON JABI LAKE |  |
|
|
America - South |
BRASILE |
FLOOD AND LANDSLIDE HAZARD FORECASTING, WARNING AND RESPONSE SYS-TEM (FLASH), MURIAÉ RIVER BASIN, NORTH REGION OF THE RIO DE JANEIRO STATE |  |
|
|
Asia |
CHINA |
NORTH CHINA PLAIN GROUNDWATER MANAGEMENT PLAN |  |
|
|
FEASIBILITY STUDY FOR THE IMPROVEMENT OF JU RIVER WATER QUALITY IN BEIJING |  |
|
|
FEASIBILITY STUDY FOR THE IMPROVEMENT OF THE HAI HE RIVER WATER QUALITY IN THE “WISDOM CITY – CSD” OF TIANJIN |  |
|
|
ENVIRONMENTAL ANALYSIS OF CHONGMING DEVELOPMENT |  |
|
|
SWIM – SUSTAINABLE WATER INTEGRATED MANAGEMENT OF THE EAST AND MIDDLE ROUTES IN THE SOUTH-TO-NORTH DIVERSION PROJECT IN CHINA |  |
|
|
THAILAND |
COASTAL RISK ANALYSIS OF TSUNAMIS AND ENVIRONMENTAL REMEDIATION (CRATER) |  |
|
|
Europe |
ALBANIA |
MONITORING OF WATER RESOURCES IN THE ERZENI RIVER BASIN |  |
|
|
ITALY |
FEASIBILITY STUDY AND DESIGN OF PRIORITY INTERVENTIONS FOR THE HYDRAULIC ASSESSMENT IN THE AREAS OF THE PROVINCE OF TERAMO AFFECTED BY FLOOD EVENT (6-7/10/2007) |  |
|
|
TOOL FOR REGIONAL-SCALE ASSESSMENT OF GROUNDWATER STORAGE IMPROVEMENT IN ADAPTATION TO CLIMATE CHANGE (TRUST) |  |
|
|
FLOOD PROTECTION OF THE TOWN OF VIPITENO (STERZING) |  |
|
|
SPECIFIC STUDIES ON THE EVALUATION OF THE DANGERS OF DEBRIS FLOW AND THE EFFECTIVENESS OF THE EXISTING PROTECTIVE WORKS PRELIMINARY DESIGN OF POSSIBLE HYDRAULIC MAINTENANCE INTERVENTIONS (AOSTA VALLEY) |  |
|
|
HYDRAULIC UPGRADING WORKS ON CENTA, ARROSCIA AND NEVA RIVERS (LIGURIA REGION) |  |
|
|
STUDY AND MONITORING OF FLOOD RISK IN THE LAND RECLAMATION DISTRICTS OF THE LAZIO REGION |  |
|
|
FEASIBILITY STUDIES FOR HYDRAULIC SET-UP OF THE RIVER PO FROM TURIN TO TANARO |  |
|
|
HYDRO-GEOLOGICAL SYSTEMS DEFINITION AND DELIMITATION OF ALLUVIAL AQUIFERS IN THE PROVINCE OF SAVONA |  |
|
|
CONSTRUCTION OF THE OVERFLOW SERVING BISAGNO RIVER (LIGURIA REGION) |  |
|
|
FEASIBILITY STUDY AND PRELIMINARY DESIGN FOR HYDRAULIC UPGRADING OF DORA RIPARIA AND TOCE RIVERS |  |
|
|
STRUCTURAL WORKS AIMED AT REDUCING THE HYDRO-GEOLOGICAL RISK CAUSED BY THE LANDSLIDE IN CANCIA, IN THE MUNICIPALITY OF BORCA DI CADORE - BELLUNO |  |
|
|
DAM FOR FLOOD CONTROL ON THE OLONA RIVER |  |
|
|
UPGRADING AND RECONSTRUCTION OF WATER SUPPLY AND DISTRIBUTION WORKS SERVING THE CONSORTIUM FOR UPGRADING AND IRRIGATION OF THE CANAL LUNENSE |  |
|
|
MONTENEGRO |
DEVELOPMENT OF PREDICTIVE HYDROLOGICAL MODEL FOR SKADAR-SHKODER LAKE WATERSHED AREA |  |
|
|
ADRICOSM STAR: INTEGRATED RIVER BASIN AND COASTAL ZONE MANAGEMENT SYSTEM IN THE MONTENEGRO COASTAL AREA AND BOJANA RIVER CATCHMENT |  |
|
|
ROMANIA |
ROMANIA-ITALY CO-OPERATION IN THE FIELD OF ENVIRONMENTAL PROTECTION AND SUSTAINABLE DEVELOPMENT – SURFACE WATERS MANAGEMENT IN THE BUCHAREST-ILFOV REGION |  |
|
|
W-BLESS - WESTERN BLACK SEA INTEGRATED ENVIRONMENTAL SYSTEM |  |
|
|
SERBIA |
PROJECT 5 BIS - INTEGRATED APPROACH FOR THE CLEAN UP OF POLLUTED RIVER SEDIMENTS - APPLICATION TO THE WASTEWATER CANAL OF PANČEVO |  |
|
|
MENA - Middle East and North Africa |
ALGERIA |
INTEGRATED WASTEWATER MANAGEMENT FOR REUSE OF TREATED WASTEWATER IN AGRICULTURE |  |
|
|
ALGERIAN COAST MANAGEMENT THROUGH INTEGRATION AND SUSTAINABILITY (AMIS)- WILAYA D’ALGER - ALGERIA |  |
|
|
EGYPT |
ARCHITECTURAL AND ENGINEERING SERVICES FOR THE FLOOD PROTECTION OF THE CITY OF DAHAB IN SOUTH SINAI, ARAB REPUBLIC OF EGYPT |  |
|
|
IRAQ |
STRATEGY FOR WATER AND LAND RESOURCES IN IRAQ - SWRLI |  |
|
|
SHATT AL ARAB IRRIGATION PROJECT – CONSULTING SERVICES FOR THE PREPARATION OF STUDIES AND ENGINEERING DESIGN |  |
|
|
ASSESSMENT AND WEB-INTEGRATION OF THE UNESCO HYDROGEOLOGICAL DATABASE |  |
|
|
CONCEPT STUDY FOR THE RE-UTILIZATION OF THE MAIN OUTFALL DRAIN (MOD) WATERS FOR INDUSTRIAL AND CIVIL PURPOSES |  |
|
|
FEASIBILITY STUDY AND PRELIMINARY DESIGN OF BASHKOTAL DAM IN SULEMANIYAH GOVERNORATE |  |
|
|
PREPARATION OF THE EMERGENCY IRRIGATION AND DRAINAGE INFRASTRUCTURE REHABILITATION PROJECT - CONSULTING SERVICES FOR PROJECT FEASIBILITY, PROJECT PREPARATION, AND IMPLEMENTATION PLAN |  |
|
|
HYDRO-GEOLOGIC STUDY FOR GROUNDWATER EXPLOITATION IN THE AREA OF SULAYMANIYAH - IRAQ |  |
|
|
PROCUREMENT AND INSTALLATION OF A HYDROLOGICAL MONITORING NETWORK FOR IRAQ |  |
|
|
THE NEW EDEN PROJECT MASTER PLAN FOR WATER RESOURCES MANAGEMENT IN THE MARSHLAND AREA |  |
|
|
THE NEW EDEN PROJECT – IMMEDIATE ACTION PLAN FOR WATER RESOURCES MANAGEMENT IN POST WAR IRAQ |  |
|
|
DESIGN AND IMPLEMENTATION OF A MARSHLANDS INFORMATION SYSTEM |  |
|
|
TRAINING AND MIGRATION OF THE GEOFIA WEB PORTAL |  |
|
|